Polythene Feeder Rar Extractor

Polythene Feeder Rar Extractor Average ratng: 3,6/5 7628reviews

Jan 11, 2005. A variety of water extraction/recharge apparatus provides for rapid and complete filling and draining of the underground reservoir. Pipes includes an outer perimeter of perforated pipes connected to the central pressurized well by a series of feeder perforated pipes in a rim-and-spoke configuration. Nov 16, 2017. For chromate surface complexes were used to extract the inner – sphere. Projects using polyethylene (PE) passive samplers to improve our ability to assess. Significant human agonistic activity (p most of all the samples irrespective of the sampling stations and seasons.

Polythene Feeder Rar Extractor

An underground reservoir for storing water in alluvial deposits utilizes slurry walls keyed to an aquiclude beneath the reservoir to form a substantially impermeable water seal. A variety of water extraction/recharge apparatus provides for rapid and complete filling and draining of the underground reservoir.

Such apparatus includes a plurality of wells distributed about the underground reservoir and a series of perforated pipes buried at a predetermined depth within the underground reservoir. A method of mitigating water table fluctuations resulting from the construction of an underground utilizes perforated pipes buried outside of the reservoir to transfer excess water from an uphill land parcel to a downhill land parcel that would otherwise experience a water shortage after construction of the underground reservoir. RELATED APPLICATIONS This application claims priority of U.S. Provisional application Ser. 60/290,785, entitled “Underground Alluvial Water Storage Reservoirs,” filed May 15, 2001, and U.S. Provisional application Ser.

60/373,887, entitled “Underground Alluvial Water Storage Reservoirs,” filed Apr. TECHNICAL FIELD The invention relates generally to storing water in underground reservoirs and, more particularly, to a method for storing an isolated supply of water in the voids found in alluvial deposits. BACKGROUND OF THE INVENTION It is becoming increasingly difficult, both in terms of cost and availability, to construct conventional open reservoirs for the storage of water. Such reservoirs typically require the construction of a dam across a river, thereby flooding vast expanses of land upstream of the dam while severely curtailing the flow of water downstream from the dam. In light of the increasing value of water and the complexities of the various water laws across different jurisdictions, it is becoming prohibitively difficult to form an open reservoir in this manner. Open reservoirs may also be formed by first excavating a large pit and then filling the pit with water, provided that the reservoir is properly lined to isolate the privately owned water from potential commingling with the public domain water in the same general alluvial deposit.

Previously, such open reservoirs could be formed by purchasing the rights to abandoned gravel quarries. However, due to the current high demand for water storage, such opportunities are extremely rare.

While it is possible to excavate a large pit for the specific purpose of forming an open water reservoir, such a technique requires a great expense of time and money to purchase the land, form the pit and dispose of the excavated material and soil, assuming that the excavated materials have no intrinsic economic value. One major disadvantage to open reservoirs is that they preempt any current or future use of the land other than to store water. That is, as additional land surface is devoted to the storage of water in open reservoirs that same land surface is unavailable for alternative uses such as farming or open space. A further disadvantage of storing water in open reservoirs is the high degree of evaporative losses experienced by such reservoirs due to relatively large air/water interface. Specifically, in arid climates (such as those found in the Western United States), open reservoirs are subject to extremely large evaporative losses.

A further unfortunate disadvantage to open reservoirs is that the reservoirs are highly susceptible to contamination. While previous concerns have been limited to accidental chemical spills, petroleum leaks, polluted surface-water runoff, and the like, a more immediate threat is that of intentional contamination as part of a terrorist act. Most municipal water reservoirs comprise unfenced bodies of waters in remote areas and are extremely difficult if not impossible to guard. Furthermore, the construction of fences around existing reservoirs would be expensive and time consuming, and even then the open reservoirs would be susceptible to contamination from the air. One proposed solution to the above-described disadvantages of open reservoirs is the construction of underground reservoirs where water is stored in the voids or interstices found in alluvial deposits.

One such method is described in U.S. 4,326,818, issued to Willis and entitled “Techniques for the Storage of Water.” The Willis patent describes forming an enclosed flexible wall extending vertically downward toward a natural aquiclude or stone base that is impermeable to water. The wall is formed by a grouting process where a grout pipe is first inserted through the soil until the pipe reaches the aquiclude and is then withdrawn while a grout material is injected under pressure from the end of the pipe. The grout material moves away from the injection zone and fills the pores of the formation where it hardens to form a grout “column.” This process is repeated numerous times to form a closed perimeter wall around a defined reservoir boundary. That is, adjacent grout columns are positioned so that there is little or no space between the columns.

A second and third round of grout columns are then formed adjacent the first round of columns to form a wall that is said to be substantially impermeable to water. Conventional wells and feed lines are then constructed within the boundary of the grout wall to withdraw and supply water to the reservoir as needed. The specific reservoir described in the Willis patent suffers from a number of drawbacks. Initially, the grout wall construction technique described by Willis (i.e., pressure-grouting clay or other “flexibilized” materials and allowing the grout to “jel” into place) does not typically form uniform subsurface columns. Rather, the grout material disperses from the end of the grout pipe in an uneven and haphazard manner (i.e., permeating different radial distances away from the grout pipe) as the grout pipe is retracted toward the surface. The uneven nature of the grouting process tends to form vertical sand seams between the grouted columns at the outer boundary of the pressure injection. These sand “lenses” or areas of high permeability formed between adjacent grout “columns” result in grout walls that do not form substantially impermeable water barriers and that are susceptible to relatively high levels of water leakage or seepage.

Additionally, it is not possible to key the grouted in-situ “columns” into the bedrock or other impermeable basement rock that defines a bottom surface of the underground reservoir. Rather, a small horizontal layer typically remains between the bottom ends of the various grout columns and the bedrock so that water may escape the reservoir through this gap between the wall and the bedrock, where the hydrostatic pressure is at its greatest level. Indeed, between the inability to form a solid impermeable wall using the grout technique, and the inability to firmly tie the grout columns to the bedrock defining the lower surface of the reservoir, the water leakage rates of a reservoir built according to the technique of the Willis patent would be prohibitively high. A second drawback to the technique of the Willis patent is the use of conventional wells for charging and extracting water from the underground reservoir. Specifically, such wells are relatively inefficient when it comes to rapidly charging the reservoir with water during periods of surplus water, such as during a Spring runoff.

The same wells are similarly inefficient with respect to withdrawing water at a desired high rate during periods when the water level within the reservoir is low. That is, because the typical groundwater flow past the well is prevented within the confines of the subsurface reservoir (and thus the water within the reservoir is not pressurized to the same degree as would be found in a natural aquifer), conventional vertical wells are unsatisfactory when it comes to extracting water at a desired rate from the underground reservoir.

A further problem associated with the underground reservoir described in the Willis patent is that there is no recognition of the problems associated with the construction of the massive subsurface walls. Specifically, the installation of any subsurface wall on the scale of that required to form an underground reservoir tends to form a dam to the normal flow of groundwater so that water levels on the upstream or “high” side of the reservoir wall will tend be higher than historic average levels, while the opposite condition (i.e., lower than average water levels) will be found on the downstream or “low” side of the reservoir. Such artificial changes to the historic water table can have severe adverse impacts on neighbors in the region. For example, neighbors on the high side of a subsurface reservoir may experience flooded basements, while neighbors on the low side will experience a dearth of water such that alluvial wells may run dry. Thus, while the Willis patent describes one theoretical design for a subsurface reservoir, the specifics of the Willis reservoir are not feasible due both to the inability to form a water-tight reservoir and the further inability to efficiently recharge and extract water from the reservoir. Additionally, the grout wall construction techniques described in the Willis patent are prohibitively expensive (costing $40-$200 per square foot of barrier), particularly when used on the scale required for an underground reservoir. Furthermore, the Willis patent does not account for the environmental impact that will be caused by the construction of the potentially massive subsurface walls.

Thus, an improved subsurface reservoir and method for storing water is needed that will address the shortcomings of the Willis design. It is with respect to these and other background considerations, limitations and problems that the present invention has evolved. SUMMARY OF THE INVENTION In accordance with the present invention, the above and other problems are solved by an underground reservoir for storing water in alluvial deposits that is formed by a slurry wall extending from a surface level to an aquiclude (e.g., bedrock) beneath the reservoir so that a bottom surface of the slurry wall is keyed into the aquiclude to form a substantially impermeable water seal within the reservoir. Generally, the reservoir includes a plurality of water extraction/recharge means distributed about the interior area of the underground reservoir to provide for rapid and substantially even filling and draining of the underground reservoir. In one embodiment, a plurality of wells may be distributed about the underground reservoir, each well connected to a pump to direct water under pressure through the plurality of wells and into the alluvial deposits of the underground reservoir. Alternatively, a series of perforated pipes may be buried at a predetermined depth within the underground reservoir so that the perforated pipes are connected to a central pressurized well that is operated to recharge and extract water from the alluvial deposits through the perforated pipes.

Ulead Photoimpact X3 Crack Download. In one preferred embodiment, the underground reservoir includes a mitigation system to reduce water table fluctuations in land parcels positioned upstream and downstream of the underground reservoir. The mitigation system may include an uphill perforated pipe installed within an upstream land parcel outside of the reservoir at a depth between a historic high and a historic low groundwater level of the upstream land parcel. The mitigation system further includes a downhill perforated pipe installed within a downstream land parcel outside of the reservoir boundary at a depth between a historic high and a historic low groundwater level of the downstream land parcel.

The uphill and downhill perforated pipes are then connected by a non-perforated conduit so that excess groundwater that has been dammed against the upstream boundary of the reservoir can be transported through the conduit and the perforated pipes to the downstream land parcel (which would otherwise experience a depressed groundwater level as a result of the damming action caused by the reservoir). In another embodiment of the present invention, a method for storing water in underground alluvial deposits includes the step of constructing an underground slurry wall to surround the alluvial deposits so that a bottom end of the slurry wall is keyed into an aquiclude running beneath the alluvial deposits, thereby forming a substantially impermeable water seal between the slurry wall and the aquiclude. The method further includes alternately extracting and recharging the underground alluvial deposits with water, such as by constructing a plurality of wells extending downward through the alluvial deposits or such as by burying a series of perforated pipes within the alluvial deposits and connecting the perforated pipes to a central well. In yet another embodiment of the present invention, a method of mitigating water table fluctuations resulting from the construction of an underground reservoir includes burying an uphill perforated pipe outside of a boundary of the underground reservoir within an upstream land parcel at a depth between a historic high and a historic low groundwater level of the upstream land parcel.

The method further includes burying a downhill perforated pipe outside of the boundary of the underground reservoir within a downstream land parcel at a depth between a historic high and a historic low groundwater level of the downstream land parcel. A non-perforated conduit is then connected between the uphill perforated pipe and the downhill perforated pipe to remove excess groundwater from the upstream land parcel and transport the excess groundwater to the downstream land parcel. In one embodiment of the invention, the first uphill perforated pipe is buried at a depth substantially equal to the historic high groundwater level, and a second uphill perforated pipe is buried a depth substantially equal to the historic low groundwater level for the upstream land parcel. The second uphill perforated pipe is then fluidly connected to the downhill perforated pipe, and a valve is positioned between the second uphill perforated pipe and the downhill perforated pipe so that the groundwater level of the upstream land parcel can be varied between the historic high and low groundwater levels. The great utility of the invention is the ability to create an efficient, cost effective water reservoir without incurring the costs associated with traditional open reservoirs. The underground alluvial reservoir achieves this end through the use of highly impermeable slurry walls to form the boundary of the reservoir, and efficient water extraction/recharge means to ensure that the reservoir can be rapidly recharged during opportune times, such as during a Spring runoff, and to further ensure that water within the reservoir may be extracted even when the water level within the reservoir is low. The underground reservoir of the present invention further mitigates any impact on surrounding land owners relating to the construction of the massive underground slurry walls by utilizing a drain system that allows dammed water on the high side of the reservoir to be transferred to the low side of the reservoir so that land parcels on the high side are not flooded while land parcels on the low side of the reservoir do not experience a dearth of water.

These and various other features as well as advantages, which characterize the present invention, will be apparent from a reading of the following detailed description and a review of the associated drawings. BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a plan view of a typical river basin illustrating a typical property boundary and a perimeter of an underground water reservoir built in accordance with an embodiment of the present invention. 2 is a section view of the river basin taken substantially along the line 2— 2 in FIG.

1 illustrating the vertical limits of slurry walls used to form the underground water reservoir, where the slurry walls are keyed into a bedrock formation underlying the river basin. 3 is a plan view similar to FIG.

1 illustrating a network of above-ground pipes connecting a plurality of extraction/recharge wells within the perimeter of the underground water reservoir. 4 is a plan view similar to FIG. 3 illustrating an alternative extraction/recharge system comprising a central well and a network of perforated pipes buried within the underground reservoir. 5 and 6 are section views of the underground reservoir similar to FIG.

2 illustrating alternative depths for the perforated pipe network shown in FIG. 7 is a section view of the underground reservoir similar to FIGS. 2, 5 and 6 illustrating the impact of the slurry wall boundaries of the reservoir on historic groundwater levels on both a “high” side and a “low” side of the reservoir. 8 is a section view of the underground reservoir similar to FIG. 7 illustrating a mitigation system for substantially maintaining the historic groundwater levels on both the “high” and “low” sides of the reservoir.

9 is a plan view similar to FIG. 1 illustrating an alternative embodiment of a water storage reservoir where an underground reservoir similar to that shown in FIGS. 1-8 shares a border with a conventional open reservoir. 10 is a section view taken substantially along the line 10— 10 in FIG. DETAILED DESCRIPTION FIGS. 1 and 2 illustrate an exemplary river system or basin 20 comprising a riverbed 22 that flows along the top of alluvial deposits 24 (e.g., sand and gravel) formed within the boundary 26 of a floodplain that extends to either side of the current riverbed 22. An arrow 28 in FIG.

1 illustrates a direction of flow of the groundwater through the alluvial deposits 24. A dashed line 30 further illustrates a typical property line of a parcel of land that abuts the river 22. An underground reservoir 32 is preferably formed with a regular geometric boundary 34, such as the rectangular boundary 34 shown in FIG.

1, so that the entire boundary 34 is contained within the property line 30. 2 illustrates a section view of the river basin 20, including the riverbed 22 itself and the lateral and vertical limits of the reservoir 32. 2 further illustrates that the reservoir 32 is preferably formed by a slurry wall 36 that is keyed into bedrock 38 or a similar aquiclude that extends below the floodplain boundary 26.

With respect to impeding groundwater flow, the slurry wall 36 provides a number of benefits over the type of grout or curtain wall described in U.S. 4,326,818 to Willis. Initially, it is noted that the slurry wall 36 may be formed in a variety of manners and with a variety of materials.

The most typical construction technique for forming a slurry wall is a trench technique that involves excavating a narrow trench that is immediately and concurrently filled with a fluid “slurry” that exerts hydraulic pressure against the trench walls to prevent the trench from collapsing as it is formed. While different materials may be used to form the slurry, bentonite clay mixed with water is the preferred slurry for use in constructing the slurry walls 36. This is because the bentonite tends to coat the walls of the trench, thereby preventing the water from being absorbed through the trench walls prior to the formation of the slurry wall 36. Additionally, the bentonite coating helps to enhance (i.e., reduce) the final permeability of the slurry wall 36.

Slurry wall trenches may be several feet wide and can be dug in excess of 100 feet deep with the use of specialty excavation equipment. Shallower trenches may be formed with conventional backhoes.

It is important to remember that the trench must extend down so that it is “keyed” into the bedrock 38 or other confining layer (such as clay) that runs below the alluvial deposits 24. In one preferred embodiment, the trench is keyed at least three feet deep into the bedrock 38. The slurry-filled trench is then backfilled with a mixture of the previously excavated soil and additional quantities of bentonite.

That is, the soil-bentonite mixture is used to fill the open trench where the mixture displaces the water-bentonite slurry and hardens to form the final “slurry wall” 36. Care must be taken with this technique to ensure an even backfill and avoid the presence of any voids in the wall or the collapse of any of the untreated soil back into the trench, either of which can form “windows” of relatively high permeability within the wall. With a carefully controlled backfill, soil-bentonite slurry walls having average permeability rates on the order of 1×10 −6 centimeters/sec (“cm/sec”) are obtainable, although permeability rates as low as 1×10 −8 cm/sec may also be obtained with a proper soil-bentonite mixture. An alternative construction technique is to use a single-step excavation process where the bentonite-water slurry is mixed with concrete so that the slurry itself hardens to form a “cement-bentonite” slurry wall 36. While a cement-bentonite slurry wall is formed more quickly than the two-step (backfill) soil-bentonite slurry wall, such one-step walls typically have slightly higher permeability levels (on the order of 1×10 −5 cm/sec). However, the permeability of both the soil-bentonite and the cement-bentonite slurry walls may be improved by adding barriers during the trenching process and prior to forming the hardened slurry wall 36. These barriers typically comprise high density polyethylene or polyvinyl chloride sheets that are added to the slurry-filled trench either prior to the backfill step of the two-step soil-bentonite slurry wall process, or prior to the hardening of the cement-bentonite wall in the one-step cement-bentonite process.

The addition of such membranes or liners further enhances the impermeable nature of the slurry walls where necessary to prevent leakage. Thus, the use of slurry walls 36 in place of the grout walls described in the Willis patent provides a number of benefits, including substantially lower rates of water leakage or seepage and substantially reduced construction costs (depending on the depth required, soil-bentonite slurry walls can be constructed for a cost of between $2 and $10 per square foot of barrier). The above description of slurry wall construction techniques is not intended to be comprehensive as to either the different techniques or materials that may be used in the formation of slurry walls 36. Additionally, because those skilled in the art will be familiar with the different slurry wall construction techniques, no further explanation or description of exemplary slurry wall construction techniques is included herein. Once an appropriate slurry wall 36 is formed about the perimeter of the underground reservoir 32, it may be necessary to first remove all of the “public” water found in the reservoir 32 and return it to the common water table (such as by pumping it to the river 22).

This initial draining of the reservoir may be necessary to respect the water rights of neighboring land owners or of the municipality that governs the property upon which the reservoir 32 is situated. Furthermore, an initial draining of the water from the reservoir 32 permits the permeability (i.e., the degree of water-tightness) of the constructed slurry wall 36 to be accurately measured so that compliance with local seepage requirements can be verified. Toward this end, a plurality of wells 40 ( FIG.

3) are preferably formed throughout the reservoir 32 to tap the water contained in the alluvial deposits of the reservoir. Each well 40 is connected by a valve 42 to a network of above-ground pipes 44 which, in turn, are connected to a common discharge point 46. A plurality of the wells 40 are required to provide adequate coverage within the reservoir 32 since the normal hydrologic currents are no longer active within the body of the reservoir 32. That is, because the water stored within the alluvial deposits of the reservoir 32 is cut off from the natural flow of groundwater through the river basin 20, the water stored within the reservoir 32 experiences a relatively low hydrodynamic pressure in comparison with the water found in aquifers outside of the reservoir boundary 34. Therefore, a plurality of wells 40 are necessary to ensure a sufficiently high flow rate and access to the entirety of the water supply within the reservoir 32.

While five separate wells 40 are shown in FIG. 3, it is understood that a larger or smaller number of wells 40 may be used depending on the size of the reservoir 32 and the nature of the soil found within the reservoir (i.e., the resistance of the soil to an unimpeded flow of water). Once the reservoir 32 is emptied of the “public” water, the same wells 40 may be used to recharge the reservoir 32 with water that is owned by the particular entity or municipality that owns the reservoir 32. The water may be directed under pressure through the pipes 44 so that the water disperses from the distal ends of the wells and into the alluvial deposits. The use of a plurality of wells 40 distributed about the area of the reservoir 32 allows for a more even filling and draining of the reservoir 32 than can be achieved by a single well. Alternatively, other un-pressurized (gravity) methods of filling the reservoir 32 may be used, such as using a series of open ponds or recharge ditches to disperse recharge water directly to the top of the alluvial reservoir 32.

An alternative to using a plurality of conventional single-point wells 40 ( FIG. 3) is to employ a network or web of in-ground, perforated drainage pipes 50 ( FIG. 4) that connect a series of locations within the reservoir 32 to a central, pressurized well 52. The system shown in FIG.

4 permits withdrawal and recharge of the reservoir water at a much faster rate than the gravity system of FIG. 3 due primarily to the greater surface area covered by the web of perforated pipes 50. The use of such a pressurized recharge system is particularly helpful when capturing and storing large quantities of recharge water during short periods of relatively high flow, such as during Spring runoff.

Similarly, the network of perforated pipes 50 helps to ensure an adequate withdrawal rate from the reservoir 32 even during periods of relatively low water levels within the reservoir. The extensive drainage system shown in FIG. 4 may be constructed at a time of low water level within the reservoir 32 (such as immediately after the reservoir has been completely pumped down by the system of wells 40 shown in FIG. 3), and before the reservoir is re-filled with privately owned water.

Preferably, a perimeter 54 of the perforated pipe 50 is located along the reservoir boundary 34 and is connected to the central well 52 by a plurality of perforated feeder pipes 56 in a rim-and-spoke configuration. Furthermore, the perforated pipes 50 are preferably buried to a predetermined depth within the reservoir 32 using a traditional open-ditch excavating technique. In one preferred embodiment shown in FIG. 5, the perforated drainage pipe 50 is buried to the alluvial-bedrock interface of the reservoir 32 and is positioned on a bed of coarse gravel pipe bedding to increase water transmission through the pipe 50 and into the adjacent alluvial deposits.

The trenches formed for the drainage pipes 50 are then preferably backfilled with a less dense, relatively permeable material 58 such as de-sanded gravel. The perforated pipes 50 are also preferably wrapped with a suitable geotextile fabric, or a combination of processed gravel and geotextile fabrics. Wrapping and supporting the perforated pipes 50 in this manner decreases the resistance and increases the flow of water through the pipe network while simultaneously reducing the likelihood that the pipes will become clogged by sediment deposits. The reduction in the amount of resistance experienced during a recharging operation allows for relatively large quantities of recharge water to be pumped into reservoir during short periods of high water flow on the river 22. 6 illustrates an alternative (shallower) depth for the perforated pipe trenches located above a mid-level of the alluvial deposit (or even shallower at a point just below the topsoil or overburden). Such a shallower depth may be preferred where construction costs must be kept to a minimum since it is less expensive to dig shallower trenches for the pipe network. Indeed, for relatively shallow depths of less than approximately eight feet, it is possible to both form the trench and pull the perforated pipe in a single pass.

Additionally, if the pipe is surrounded by the relatively coarse pipe bedding described above, it may be possible to achieve even higher pressures resulting in slightly faster recharge rates for the reservoir 32 due to the fact that the water may be dispersed in both an upward and a downward direction from the perforated pipe 50. However, positioning the pipes 50 at a relatively shallow depth exposes the pipes to a higher risk of being unintentionally severed by surface activities, or of being fouled by the roots of surface vegetation. Thus, the appropriate depth for the network of pipes 50 shown in FIG. 4 will vary with the surface use of the land. Additionally, while the relatively deep system of pipes 50 shown in FIG. 5 is more efficient at withdrawing water, the shallower system of pipes 50 shown in FIG.

6 is more efficient when it comes to rapidly recharging the reservoir 32. Thus, a selection between the two types of systems will depend on the anticipated operational requirements of the reservoir. Of course, where it is economically feasible, the two systems shown in FIGS. 5 and 6 could be combined to provide for both maximum withdrawal and recharge rates. In addition to the above-described extraction/recharge wells 40 and 52, the reservoir 32 of the present invention also preferably includes a plurality of monitoring wells (not shown) distributed both within the interior of the reservoir and outside of the reservoir along the reservoir boundary 34. The plurality of monitoring wells can provide an area weighted average water level within the reservoir for use in determining withdrawal and recharge rates of water in the reservoir 32, as well as the overall capacity of the reservoir (in conjunction with the measured porosity of the alluvium within the reservoir 32) for accounting purposes. However, while the slurry walls 36 are substantially more impermeable to water leakage than grout walls, even soil-bentonite slurry walls 36 will permit small amounts of water seepage both into and out of the reservoir 32.

Therefore, a number of “perimeter” monitoring well pairs (not shown) are preferably formed adjacent one another on opposite sides of the slurry wall 36 about the reservoir boundary 34 to help detect water seepage through the walls 36. Patent Citations Cited Patent Filing date Publication date Applicant Title * Jan 29, 1915 Nov 2, 1915 Jesse Lowe Sr Reservoir and method of its construction. May 28, 1915 Feb 29, 1916 Thomas E Murray Dish-washing machine. Referenced by Citing Patent Filing date Publication date Applicant Title Feb 23, 2005 Mar 20, 2007 Ps Systems Inc.

Direct recharge injection of underground water reservoirs Mar 14, 2008 Jul 5, 2011 PS Systems, Inc. Bank-sided porosity storage reservoirs Sep 26, 2007 Dec 13, 2011 PS Systems, Inc. Maintaining dynamic water storage in underground porosity reservoirs Mar 3, 2010 Dec 25, 2012 Wayne Poerio Process for in-ground water collection Jul 31, 2012 Apr 21, 2015 The United States of America, as represented by the Secretary of the Department of the Interior Artificial recharge system * Feb 2, 2012 Jul 21, 2015 Russell J. Sasakura Underground storage heating and cooling (USHC) system * Mar 25, 2015 Mar 8, 2016 The Regents Of The University Of Colorado, A Body Corporate System and method of using differential elevation induced energy for the purpose of storing water underground * Apr 27, 2013 Jun 21, 2016 China Shenhua Energy Company Limited Method for distributed storage and use of underground water in mine * Feb 23, 2005 Aug 25, 2005 Ps Systems Inc.

Direct recharge injection of underground water reservoirs * Mar 19, 2007 Jul 5, 2007 Ps Systems Inc. Direct Recharge Injection of Underground Water Reservoirs * Sep 26, 2007 Mar 27, 2008 Ps Systems Inc. Maintaining dynamic water storage in underground porosity reservoirs * Sep 26, 2007 Mar 27, 2008 Ps Systems Inc. Ventilation of underground porosity storage reservoirs * Mar 14, 2008 Sep 18, 2008 Ps Systems Inc. Bank-Sided Porosity Storage Reservoirs * Jan 6, 2009 Jul 9, 2009 Ps Systems Inc.

Autodata 3 23 Keygen Free. Controlling gas pressure in porosity storage reservoirs * Mar 3, 2010 Oct 21, 2010 Wayne Poerio Process for in-ground water collection * May 16, 2011 Sep 22, 2011 Ps Systems Inc. Direct recharge injection of underground water reservoirs * Apr 27, 2013 May 7, 2015 China Shenhua Energy Company Limited Method for Distributed Storage and Use of Underground Water in Mine.